My Procurement Projects
One workspace to track every RFQ, sample, production batch and shipment — across every supplier HJT engages on your behalf.
Analytics Overview
My Procurement Projects
500kVA Oil-Immersed Transformer
Stainless Steel Kitchenware OEM
Industrial Gearbox — Custom Spec
Solar Mounting Structures
EV Charger Enclosures
Hydraulic Hose Assemblies
Aluminum Die-Cast Housings
Agricultural Diesel Pumps
Procurement Progress
Visual timeline of the active project. The highlighted node is the current stage; completed stages remain locked-in.
- Stage 01DoneRequirementRFQ captured & validated
- Stage 02DoneSupplier MatchingVerified factories shortlisted
- Stage 03DoneQuotationComparative quotes prepared
- Stage 04DoneSample ApprovalPre-production sample signed off
- Stage 05CurrentProductionOrder in active manufacturing
- Stage 06InspectionPre-shipment QC by HJT team
- Stage 07ShippingIn transit to destination port
- Stage 08DeliveredReceived & confirmed by buyer
Documents
Every export document prepared by HJT, organised in one secure workspace.
Commercial Invoice
Packing List
Inspection Report
Certificate of Origin
Bill of Lading
Quality Report
Communication Center
Every stakeholder of your sourcing project — buyer, HJT manager, factory, QC and logistics — in one secure thread view.
Aria Walker · Northwind Ltd.
Confirming the revised PO quantity — please share the updated PI.
David Lin · Account Lead
Inspection slot booked for Friday. I'll join the call at 10:00 HKT.
Hangzhou Jingyi Co.
Production batch #2 completed. Photos uploaded to the project folder.
Mei Zhao · QC Team
Pre-shipment AQL 2.5 passed. Full report ready for your review.
Pacific Freight · Mark Tan
Container booked on COSCO SHE-LAX 0628. ETD confirmed.
AI Procurement Assistant
Real-time intelligence across your active sourcing project — generated from supplier data, market signals and HJT operating history.
Approve revised PI from Hangzhou Jingyi
Pricing aligned with target; signing today protects the booked production slot for Batch #3.
- Review PI v2 (USD 184,200)
- Counter-sign and return
- Trigger 30% deposit
Port congestion at Yantian rising
Average dwell time increased 38% over the last 14 days; may push ETD by 4–6 days if not pre-booked.
- Late shipment penalty exposure
- Storage fees after free time
- Buyer SLA at risk
Lock container space this week
Book FCL 2x40HQ on COSCO SHE-LAX 0628 and schedule pre-shipment inspection 5 days prior to ETD.
- Confirm freight forwarder
- Issue SI by Wednesday
- Schedule AQL 2.5 inspection
47 days door-to-door
Production 28 d · Inspection 3 d · Ocean freight 14 d · Customs & last-mile 2 d.
- Production: 28 days
- Ocean freight: 14 days
- Buffer: 2 days
3 verified factories matched
Pre-qualified backups with comparable capacity and HJT audit scores ≥ 86 for the same SKU family.
- Ningbo Huasheng — Gold Supplier
- Foshan Linyi — Strategic Partner
- Suzhou Vortex — Verified
Save up to 7.4% on landed cost
Consolidating Batch #2 and #3 into one LCL-to-FCL shipment reduces freight and inspection overhead.
- Freight saving: USD 4,820
- Inspection saving: USD 600
- Combined PO discount: 2.1%